08/01/2002: Pacific Gas and Electric Pipeline Gilroy / Hollister CA
Pipeline Owner: |
Pacific Gas and Electric |
Contractor: |
Mears Group Inc. |
Problem: |
Steep terrain conditions and unavailability of select fill made "padding" difficult and uneconomical. |
Job Description: |
Excavation of 3,500 feet of 34" pipe, Scrape exterior of the pipe to remove the deteriorated Coal Tar enamel coating, Sandblast to near white finish, Spray-apply Powercrete J coating, Re-bury the pipeline with sufficient rockshield protection. |
Remedy: |
Wrap pipeline with custom size 3/8" x 72" x 111" yellow, Flexible PVC, Tuff-N-Nuff protective wrap instead of using a padding machine. |
Comments: |
"The flexible Tuff-N-Nuff pads were received in the exact size needed to install on this 34-inch pipeline with no cutting or wasted material". Installation was fast and the Tuff-N-Nuff design allowed Mears to finish the job "2 days ahead of schedule and under-budget" "We are confident that this pipeline will be protected and operating for many, many years thanks to Tuff-N-Nuff". |